Seiko 7B24 User Manual Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
6
5. Installation and Connection
5.1 HEATER BODY installation
2. Pass TUBE SET through the each hole of
HEATER CAP COVER and HOLDER CAP
HEATER CAP COVER
HOLDER CAP
4. Tighten TIP NOZZLE and HOLDER CAP.
5. Put through HEATER HOLDER and put MOUNTING BRACKET.
HEATER HOLDER
MOUNITNG BRACKET
1. Cover HEATER COVER
to HEATER BODY.
HEATER COVER
HEATER BODY
3. Pass TUBE SET through HEATE BODY and
TIP NOZZLE.
TIP NOZZLE
After power on, HEATER has high temperature.
So please DO NOT touch directly.
Page view 5
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments